1-3tph Congo Dharam tin ore beneficiation plant

【Project Time】23th,May. 2018

【Country】Congo

【Capacity】1-3 tons per hour

【Process】Electromagnetic

【Raw ore】Tin

Overall process

A Congo tin mine project has been in preparation for more than 3 months, and after speaking with the customer, we discovered that the customer wants a simple beneficiation plant. Customized beneficiation plans have been developed for the customer, including a crusher and roller breaker, a jig machine, a shaking table, and an electromagnetic separator with a three-disc electromagnetic separator.

1-3tph Congo Dharam tin ore beneficiation plant Simple processing gravity electromagnetic 第1张

Gravity separation and electromagnetic separation are used in this concentrator. In order to produce tin concentrate use a tin ore beneficiation plant, raw ore is crushed to 200mm and then ground to 200 mesh by closed-circuit grinding, comprising 60-65%. An electromagnetic separator is used to separate minerals.

1-3tph Congo Dharam tin ore beneficiation plant Simple processing gravity electromagnetic 第2张

We have a very strict management system for each project, and one person will be responsible for it from start to finish. This allows the whole process to run smoothly. Engineering design, precise positioning technology, and its products will be the starting point of the design institute, not only ensuring the technology but also reducing customer costs and selecting the best process.

Tuxingsun Mining is a global leader in tin ore and other metal ore mining solutions & equipment, if you are looking for a reliable tin ore partner, please don’t hesitate to contact

Contact: Pingheng

Tuxing Sun Mineral Processing Expert

Wechat/whatapp:+86 18092529083

Email:[email protected]

Leave a message with your needs or comments

Add comment:

WeChat

+86 18092529083Scan QR code8618092529083